Operational Validation

Operational validation checks whether a health economic model's outputs are accurate enough for their intended use, against observed data or other models.

Status
Published, version 1.0.0
Last reviewed
12 Nov 2026, by Dr Darrin Baines
Report a problem
Tell us if something is wrong or out of date

Concept Architecture

Operational Validation of Health Economic Models

Operational validation is the part of model validation that judges a decision model by what it produces. The question is whether the survival, event counts, costs and QALYs a committee will act on are close enough to reality for the decision, across the populations and settings the model is meant to cover. In Sargent's simulation framework, whose stages the AdViSHE tool also follows for health economic models, this stage comes after conceptual model validation and verification of the computerised model, and much of the validation testing happens here. Robinson's term black-box validation names the same overall check and differs from Black-Box Testing, a verification check on the model's calculations.

Broad and narrow uses of the term

Sargent defines operational validation as determining whether the model's output behaviour has the accuracy required for its intended purpose over the domain of its intended applicability. He treats every validation technique he lists as applicable to it, predictive validation included.

AdViSHE, developed by Vemer and colleagues, keeps that frame. Its Part D, headed operational validation, asks about face validity of model outcomes (D1), cross validation against other models (D2, unrelated to the statistical Cross-Validation of prediction models), validation against outcomes using alternative input data (D3) and validation against empirical data (D4), split into dependent and independent comparisons. Version 5.0 of the Australian PBAC guidelines also titles section 3A.7.1 operational validation of the economic model.

Wright and colleagues use the term narrowly, as one of three criteria of external validation beside convergent validity and predictive validity, limited to comparing outputs with data that were, or were not, used to build the model. This page uses the broad sense, in which Face Validity applied to outcomes, Cross Validity, External Validation and Predictive Validation are all operational validation techniques.

Technical Verification asks whether the model was built as specified, while operational validation asks whether the specified model gives answers close enough to the real world. A model can pass every verification test and still fail here because a transition probability came from an unrepresentative trial, and Sargent notes that verification and validation must be repeated whenever the model changes.

Accuracy set in advance for the intended purpose

Sargent recommends specifying the accuracy required of each output of interest before model development starts, or very early in it. He calls this the acceptable range of accuracy, usually stated as a range for the difference between a model variable and the corresponding system variable.

Eddy and colleagues make the same point for health economics in the ISPOR-SMDM task force report. Much less accuracy is needed to say whether an intervention increases or decreases costs than to say how much it will cost, so validity belongs to an application and not to the model for all time. Sargent also asks for comparisons under several sets of conditions from the domain of intended applicability, here the subgroups, comparators, time horizons and settings the analysis covers, together its Domain of Applicability.

Observable and non-observable systems

Observability, meaning whether data can be collected on how the real system behaves, is for Sargent the major attribute affecting operational validity. In a technology appraisal the comparator arm over the trial follow-up is usually observable through control arms and registries. The new technology beyond trial follow-up is not, and Sargent warns that a high degree of confidence is then usually out of reach, so behaviour should be explored as thoroughly as possible and compared with other valid models.

ApproachObservable systemNon-observable system
SubjectiveComparison using graphical displays, and exploring model behaviourExploring model behaviour, and comparison with other models
ObjectiveComparison using statistical tests and proceduresComparison with other models using statistical tests

Exploring behaviour means checking the direction, and where experts can judge it the size, of output changes as inputs vary, mainly through parameter variability sensitivity analysis. Sargent's test is whether the model shows the same relationships as the real system, which makes this a question about the disease and not about the code. Eddy and colleagues add that sensitivity analysis by itself does not show how accurately a model simulates reality, so exploration complements comparison with data and cannot replace it.

Techniques applied to a cost-effectiveness model

The AdViSHE items and Sargent's list give a working set of techniques. Each compares model outputs with a different benchmark.

TechniqueWhat the model output is compared withTerm from
Face validity of outcomesExpert judgement on life years, deaths, hospitalisations and total costsAdViSHE D1
Cross ValidityOutcomes of other models of a similar problemAdViSHE D2, PBAC 3A.7.1
Alternative Input Data ValidationOutcomes when inputs come from other sources or a split of the dataAdViSHE D3
Dependent validationData sources used to build the modelAdViSHE D4.A, PBAC 3A.7.1
Independent validationData sources not used to build the modelAdViSHE D4.B, PBAC 3A.7.1
Event validityCounts of the same events in the real systemSargent
TracesExpected patterns over time and empirical dataPBAC 3A.7.1

The PBAC guidelines ask for a cohort trace for both arms with a comment on whether each is logical, for example overall survival converging to zero by the time horizon, and say traces can inform the face validity of the model logic, computerisation and external validity. Trace Validation therefore spans verification and validation.

In Sargent's account, graphs support a subjective judgement, while confidence intervals and hypothesis tests support an objective one and are preferable. Graphs remain the most common, because statistical assumptions often fail or system data are too few.

Worked example with a heart failure model and a registry

All numbers in this example are illustrative. A cohort Markov model of a heart failure drug is run for a national registry population under standard care over 5 years. The registry was not used to build the model, so this is an independent validation. The team and the commissioning body agreed in advance that a relative difference of up to 10% in each output would not change the decision.

d=100×P−OOd = 100 \times \frac{P - O}{O}

where dd is the relative difference in per cent, PP is the modelled value and OO is the observed registry value.

Output per 1,000 people over 5 yearsObserved OOModelled PPP−OP-Odd (%)Within 10%
Deaths480456-24-5.0Yes
Heart failure admissions9001,02612614.0No
Life years, undiscounted3,6003,7001002.8Yes

1. Deaths and life years. The model gives 24 fewer deaths, 100 × 24 / 480 = 5.0% below the registry, and 100 extra life years, 100 × 100 / 3,600 = 2.8% above it. Both lie inside the agreed range.

2. Admissions. The excess of 126 admissions gives 100 × 126 / 900 = 14.0%, outside the range. This failed event validity check sends the analyst back to the source of the admission rate.

3. Effect on the decision. If the drug cuts admissions by 30%, the model credits it with 0.30 × 1,026 = 307.8 admissions avoided per 1,000 people against 0.30 × 900 = 270 at the observed rate. At GBP 3,000 per admission the cost offset is overstated by 37.8 × 3,000 = GBP 113,400 per 1,000 people, or GBP 113.40 per person, in the drug's favour.

4. Sampling error in the registry. A difference inside the range may still be uncertain, and Sargent's confidence interval approach checks this.

CI95=(P−O)±1.96O(1−O)n\text{CI}_{95} = (P - O) \pm 1.96 \sqrt{\frac{O(1 - O)}{n}}

where PP is the modelled 5-year proportion who die, OO is the observed proportion, nn is the number of registry patients and 1.96 is the normal quantile for 95% confidence. The cohort model is deterministic, so only the registry proportion carries sampling error.

With OO = 0.480 and nn = 1,000, the product O(1−O)O(1-O) is 0.480 × 0.520 = 0.2496. Dividing by the sample size gives 0.2496 / 1000 = 0.0002496, whose square root, the standard error, is 0.0158, and the half-width is 1.96 × 0.0158 = 0.031. The difference P−OP-O is 0.456 less 0.480, or -0.024, so the interval is -0.055 to 0.007. The agreed range is 10% of 0.480, or plus or minus 0.048, and the lower limit lies beyond it, so a registry of 1,000 cannot confirm the required accuracy even though the point estimate meets it. With 4,000 patients the half-width falls to 1.96 × 0.0079 = 0.0155 and the interval of -0.0395 to -0.0085 sits inside the range.

What submissions report and reviewers check

NICE PMG36 (2022, updated 2026) asks for the quality assurance methods used in developing the model and for the methods and results of model validation, with disaggregated results that include life years gained, mortality rates and the frequency of selected outputs predicted by the model (section 4.6.4), giving an External Assessment Group outputs to set beside registry data. Section 4.6.20 asks that extrapolation be checked for clinical and biological plausibility and against external data such as historical cohort data sets.

The CDA-AMC Model Validation Tool, published under the CADTH name by Coyle and colleagues as CADTH practice, not a submission requirement, asks whether model output on time in health states, clinical events, adverse events and mortality matches a reliable external source, such as trial data, real-world evidence or expert opinion.

Limits and common misreadings

Robinson argues that absolute validity cannot be shown. Validation tries to prove a model incorrect, so each test survived raises confidence for an application without settling general validity.

  1. Counting a calibrated fit as validation. Eddy and colleagues note that dependent validations are closely related to calibration and say validation sources should be independent where feasible.
  2. Validating once and reusing for years. Sargent recommends a schedule for periodic review when a model is used over time.

Sources

  • Coyle D, Haines A, Lee K. The development of a model validation tool to assist in the conduct of economic evaluations. Canadian Journal of Health Technologies. 2024;4(3). https://doi.org/10.51731/cjht.2024.862
  • Eddy DM, Hollingworth W, Caro JJ, Tsevat J, McDonald KM, Wong JB. Model transparency and validation: a report of the ISPOR-SMDM Modeling Good Research Practices Task Force-7. Value in Health. 2012;15(6):843-850. https://doi.org/10.1016/j.jval.2012.04.012
  • National Institute for Health and Care Excellence. NICE technology appraisal and highly specialised technologies guidance: the manual (PMG36). Published 31 January 2022, last updated 13 October 2026. Sections 4.6.4 and 4.6.20. https://www.nice.org.uk/process/pmg36
  • Pharmaceutical Benefits Advisory Committee. Guidelines for preparing a submission to the Pharmaceutical Benefits Advisory Committee, version 5.0. September 2016. Section 3A.7. https://pbac.pbs.gov.au/section-3a/3a-7-model-validation.html
  • Robinson S. Simulation model verification and validation: increasing the users' confidence. In: Proceedings of the 1997 Winter Simulation Conference. 1997:53-59. https://www.informs-sim.org/wsc97papers/0053.PDF
  • Sargent RG. Verification and validation of simulation models. In: Jain S, Creasey RR, Himmelspach J, White KP, Fu M, eds. Proceedings of the 2011 Winter Simulation Conference. IEEE; 2011:183-198. https://www.informs-sim.org/wsc11papers/016.pdf
  • Vemer P, Corro Ramos I, van Voorn GAK, Al MJ, Feenstra TL. AdViSHE: a validation-assessment tool of health-economic models for decision makers and model users. PharmacoEconomics. 2016;34(4):349-361. https://doi.org/10.1007/s40273-015-0327-2
  • Wright SJ, Gray E, Rogers G, Donten A, Payne K. A structured process for the validation of a decision-analytic model: application to a cost-effectiveness model for risk-stratified national breast screening. Applied Health Economics and Health Policy. 2024;22:527-542. https://doi.org/10.1007/s40258-024-00887-z

Frequently Asked Questions (6)

  • What is Operational Validation?

    Operational validation checks whether a health economic model's outputs are accurate enough for their intended use, against observed data or other models.

    Source: Sargent 2011

  • How is operational validation of a health economic model carried out against observed data?

    Sargent recommends agreeing the accuracy required of each output before model development starts, usually as an acceptable range for the difference between a model value and the matching real value. The model is then run for a population with observed data, such as a registry cohort under standard care, and its outputs, for example deaths and hospital admissions, are set beside the observed counts. Graphs support a subjective judgement, while confidence intervals and hypothesis tests support an objective one and are preferable. A difference inside the agreed range can still be uncertain when the registry is small, and a confidence interval for the difference shows whether the required accuracy is confirmed.

    Source: Sargent 2011

  • How does operational validation differ from verification of a health economic model?

    Verification asks whether the model was built as specified, for example whether the computer program carries out the conceptual model correctly. Operational validation asks whether the specified model gives answers close enough to the real world for the decision at hand. A model can pass every verification test and still fail operational validation because a transition probability came from an unrepresentative trial. Sargent places operational validation after conceptual model validation and verification of the computerised model, and notes that verification and validation must be repeated whenever the model changes.

    Source: Sargent 2011

  • Which AdViSHE items cover operational validation of a health economic model?

    AdViSHE, the validation-assessment tool developed by Vemer and colleagues for decision makers and model users, groups operational validation in Part D. Item D1 asks whether experts judged the face validity of model outcomes, and D2 asks about cross validation against other models of a similar problem. Item D3 covers validation against outcomes obtained with alternative input data. Validation against empirical data falls under D4, split into comparisons with data sources used to build the model and with a source not used. A reviewer of an HTA submission can read the completed Part D to see which outputs were tested and against which benchmark.

    Source: Vemer et al. 2016

  • What does NICE ask for that supports operational validation when a company submits a health economic model?

    Section 4.6.4 of the NICE manual PMG36 asks companies to detail the quality assurance methods used in developing the model and to give the methods and results of model validation. It also asks for disaggregated results with a table of key results, which for a cost utility analysis include life years gained, mortality rates and the frequency of selected outputs predicted by the model. These outputs give a NICE External Assessment Group modelled figures to set beside registry or trial data. For the extrapolated period beyond the trial, section 4.6.20 asks that external validity be judged by clinical and biological plausibility and by coherence with external data such as historical cohort data sets.

    Source: NICE PMG36 (2022, updated 2026)

  • How does calibration affect the operational validation of a health economic model?

    Eddy and colleagues call a validation dependent when the same source was used both to estimate model parameters and to validate the model, and they note that dependent validations are closely related to calibration, where data are used to fit parameters. A partially dependent validation uses a source that built or calibrated part of the model without wholly determining the output tested. The task force says studies chosen for validation should be independent, although this may be infeasible when the data are needed to build the model. Models checked by dependent comparisons can still be useful, and reports should state how each source relates to the model.

    Source: Eddy et al. 2012

Trust Record

Verified by Dr Darrin Baines

British health economist

Professional identity: darrinbaines.org

Verification date: 12 Nov 2026

Content version: 1.0.0

Canonical Identity

Term code
HE-EM-MV-103

Stable URI · Machine-readable · Resolvable · CC BY 4.0

This article is licensed under Creative Commons Attribution 4.0 International (CC BY 4.0).

Author: Dr Darrin Baines · Publisher: Intelligent Parameters Ltd · Identifier: https://healtheconomics.wiki/concept/operational-validation