Validation Plan

A validation plan sets out, before results are known, which tests, data sources and acceptance criteria will be used to validate a health economic model.

Status
Published, version 1.0.0
Last reviewed
12 Nov 2026, by Dr Darrin Baines
Report a problem
Tell us if something is wrong or out of date

Concept Architecture

Validation Plan for a Health Economic Model

A validation plan is the part of model validation that is written down first, before any comparison has been run. For a health economic model it names the outputs that matter for the decision, the tests each will face, the data it will be compared with and how close the match must be. Its value comes from timing, since tests and sources chosen after the modeller has seen the results can be picked to agree with the model. In health technology assessment a dated plan helps a reviewer judge whether a validation could have failed or was arranged to succeed.

Choosing tests and sources before the results are known

The ISPOR-SMDM task force report on model transparency and validation by Eddy and colleagues states that, ideally, the validation plan and sources should be chosen before the results are known. Sources should be found by a formal search and justified by the intended use of the model, not by convenience or the likelihood of a successful validation, and the choice might be made by an independent panel.

Kent and colleagues, writing from the Mount Hood Diabetes Challenge Network, propose running models for similar applications through a common set of pre-defined simulation scenarios, and add that this would limit selective reporting of validation studies because modelling groups would have to commit to validations before knowing the results. Model Registry and Validation Reporting build on this.

Ghabri and colleagues show how far practice falls short in a French pilot study in which two health economists reviewed the 77 manufacturers' cost-effectiveness analyses received by the French National Authority for Health (HAS) between 2013 and 2017. They found a general lack of a validation plan or statistical rationale. Fewer than half reported a validation process, and only 35% performed any external validation.

What a validation plan for a decision model records

No fixed template exists. The rows below follow Eddy and colleagues and the procedure of Sargent, a simulation scientist whose typology of validation techniques underlies the AdViSHE tool.

Element of the planWhat it records
Intended applicationThe decision problem, population, comparators and outputs of interest
Verification testsChecks that the model was built as specified, such as TECH-VER items and black-box testing
Validation testsWhich of face validity, cross validity, external validation and predictive validation will be done, for which outputs
Data sourcesHow sources are found, why each was chosen, whether each is dependent, partially dependent or independent, and which model part it tests
Acceptance criteriaThe acceptable range of accuracy for each output and how comparisons are summarised
Response and revalidationWhat is reported if a test fails, and when tests are repeated

The data source row follows best practice VII-6 of Eddy and colleagues, which asks for a formal external validation process. A validation is dependent when the same source was used both to estimate parameters and to validate the model, and independent when none of the source's information was used to build it. Best practice VII-8 asks developers of multi-application models to say when validations should be repeated, and Sargent asks for a schedule of periodic review for a model in continued use.

A source used as a calibration target has informed the model and cannot later count as an independent validation source, so the plan says which data are reserved for which purpose.

Keeping verification and validation apart in the plan

Verification asks whether the model was built right, and validation whether it is the right model for the decision. Sargent adopts definitions of verification as ensuring that the computer program of the computerised model and its implementation are correct, and of validation as substantiation that the model has a satisfactory range of accuracy for its intended application within its domain of applicability. Technical Verification covers the first. Eddy and colleagues count verification, or internal validity, as one of five types of validation, so a validation plan in this broad sense also lists verification tests, labelled separately.

Pre-specification applies to verification tests too. AdViSHE, by Vemer and colleagues, asks of unit testing whether a protocol describing the tests, criteria and acceptance norms was defined beforehand. Item 29 of the CDA-AMC Model Validation Tool, which Coyle and colleagues developed at CADTH, checks that effectiveness can be set so that the QALY estimates of the technologies are equal, so a plan can state in advance that incremental QALYs must then be zero.

Setting the acceptable range of accuracy in advance

The acceptable range of accuracy turns a comparison into a test the model can fail. Sargent defines it as the accuracy a model needs to be valid for its intended purpose, usually set for each output of interest as a range for the difference between the model value and the real system value. His recommended procedure starts with an agreement between the modelling team and the sponsors, and if possible the users, on the validation approach before the model is developed, followed by specifying the required accuracy before development starts or very early in it.

Eddy and colleagues explain why the range depends on the question. Much less accuracy is needed to say whether an intervention will increase or decrease costs than to say how much it will cost. For a summary measure, they note, the proportion of results within any specified bound can be reported. Sargent also describes comparison by hypothesis test, whose null hypothesis is that the model is valid for the acceptable range, and calls the probability of accepting an invalid model the model user's risk, which must be kept small. The pages Degree of Validity and Domain of Applicability take these ideas further.

Worked example of a plan for a survival model

All numbers in this example are illustrative. A company builds a partitioned survival model for a cancer drug. Before running any comparison, its plan records two tests. A verification test sets progression-free survival, overall survival, adverse events and utilities equal in both arms, and requires incremental QALYs of zero. An external validation compares modelled overall survival in the comparator arm at one, three and five years with a national cancer registry cohort similar to the trial population and not used to build the model, with an acceptable range of 0.03.

dt=S^(t)−S(t)d_t = \hat{S}(t) - S(t)

where dtd_t is the difference at year tt, S^(t)\hat{S}(t) is the modelled proportion of comparator patients alive at year tt and S(t)S(t) is the observed proportion alive in the registry cohort. A time point passes when ∣dt∣≤δ|d_t| \le \delta, where δ\delta is the acceptable range of 0.03.

p=npassnp = \frac{n_{\text{pass}}}{n}

where pp is the proportion of comparisons within the acceptable range, npassn_{\text{pass}} is the number of time points that pass and nn is the number of time points compared. This point comparison ignores sampling error in the registry proportions, and Sargent notes that confidence intervals for the difference between model and system can instead serve as the model's range of accuracy.

  1. Verification. With equal inputs in both arms the model returns incremental QALYs of 0.000, a pass.
  2. Year one. The model gives 0.82 and the registry 0.80, so d1d_1 is 0.02, within 0.03.
  3. Year three. The model gives 0.47 and the registry 0.45, so d3d_3 is 0.02, within 0.03.
  4. Year five. The model gives 0.31 and the registry 0.26, so d5d_5 is 0.05, outside 0.03.
  5. Summary. Two of three time points pass, so pp is 2 divided by 3, or about 0.67.

The model tracks registry survival at one and three years and overstates it at five years, where the extrapolation dominates, and the plan requires that failure to be reported. Without a plan the team could have switched, after seeing the results, to the trial's own extension cohort with five-year survival of 0.29, a difference of 0.02 and a clean pass. That cohort informed the survival curve, so the comparison would have been dependent. If the team then uses the registry to choose a new curve, later comparisons with the registry are no longer independent, and the plan should record this.

How HTA reviewers use a validation plan

The NICE manual PMG36 (2022, updated 2026) does not use the term validation plan in its chapter on economic evaluation. Paragraph 4.6.4 asks companies to detail the quality assurance methods used in developing the model and to provide the methods and results of model validation. Paragraph 4.6.20 asks that the external validity of an extrapolation be assessed by its clinical and biological plausibility and its coherence with external data sources such as historical cohort data sets. An early plan supplies those methods and is evidence that the sources were not picked to fit.

Corro Ramos and colleagues name the NICE External Assessment Groups as an example of independent validators without conflicts of interest. With a plan in hand, such a reviewer can check its date, the reason each source was chosen, whether each was dependent or independent and whether every planned test is reported, failures included.

A validation plan can sit inside a wider health economic analysis plan. CHEERS 2022, item 4, asks authors to indicate whether a health economic analysis plan was developed and where it is available. In 78 model-based evaluations, Abraham and colleagues found validation efforts still reported non-systematically, with tests and results rarely detailed.

Limits and common misunderstandings

A plan does not make a model valid. It fixes the terms of the tests before they are run, and Eddy and colleagues stress that no criteria can declare a model valid for all its applications and all time.

Eddy and colleagues accept that independent studies may be infeasible when the data are needed to build the model, and that partially dependent and even dependent validations can still be useful. The plan then labels them as such.

Sensitivity analysis does not replace the planned tests. Eddy and colleagues call it a complement to validation, not a substitute, and Abraham and colleagues found one-way and probabilistic sensitivity analyses still mistaken for validation. Kent and colleagues, citing Sampson and Wrightson, note that pre-registration of all analysis plans is less feasible for model-based evaluations than for trials. A plan may therefore need dated amendments that record whether results had been seen.

Sources

  • Abraham K, Corro Ramos I, Braal CL, Feenstra T, Kleijburg A, van Voorn GAK, Uyl-de Groot C. Under-reporting of validation efforts for health economic models persists despite the availability of validation tools: a systematic review. PharmacoEconomics. 2025;43:849-858. https://doi.org/10.1007/s40273-025-01491-2
  • Corro Ramos I, Feenstra T, Ghabri S, Al M. Evaluating the validation process: embracing complexity and transparency in health economic modelling. PharmacoEconomics. 2024;42:715-719. https://doi.org/10.1007/s40273-024-01364-0
  • Coyle D, Haines A, Lee K. The development of a model validation tool to assist in the conduct of economic evaluations. Canadian Journal of Health Technologies. 2024;4(3). https://doi.org/10.51731/cjht.2024.862
  • Eddy DM, Hollingworth W, Caro JJ, Tsevat J, McDonald KM, Wong JB. Model transparency and validation: a report of the ISPOR-SMDM Modeling Good Research Practices Task Force-7. Value in Health. 2012;15(6):843-850. https://doi.org/10.1016/j.jval.2012.04.012
  • Ghabri S, Stevenson M, Möller J, Caro JJ. Trusting the results of model-based economic analyses: is there a pragmatic validation solution? PharmacoEconomics. 2019;37:1-6. https://doi.org/10.1007/s40273-018-0711-9
  • Husereau D, Drummond M, Augustovski F, et al. Consolidated Health Economic Evaluation Reporting Standards 2022 (CHEERS 2022) statement: updated reporting guidance for health economic evaluations. BMJ. 2022;376:e067975. https://doi.org/10.1136/bmj-2021-067975
  • Kent S, Becker F, Feenstra T, et al. The challenge of transparency and validation in health economic decision modelling: a view from Mount Hood. PharmacoEconomics. 2019;37:1305-1312. https://doi.org/10.1007/s40273-019-00825-1
  • National Institute for Health and Care Excellence. NICE technology appraisal and highly specialised technologies guidance: the manual (PMG36). Chapter 4, Economic evaluation. Published 31 January 2022, last updated 13 October 2026. https://www.nice.org.uk/process/pmg36/chapter/economic-evaluation-2
  • Sargent RG. Verification and validation of simulation models. In: Jain S, Creasey RR, Himmelspach J, White KP, Fu M, eds. Proceedings of the 2011 Winter Simulation Conference. IEEE; 2011:183-198. https://www.informs-sim.org/wsc11papers/016.pdf
  • Vemer P, Corro Ramos I, van Voorn GAK, Al MJ, Feenstra TL. AdViSHE: a validation-assessment tool of health-economic models for decision makers and model users. PharmacoEconomics. 2016;34(4):349-361. https://doi.org/10.1007/s40273-015-0327-2

Frequently Asked Questions (6)

  • What is Validation Plan?

    A validation plan sets out, before results are known, which tests, data sources and acceptance criteria will be used to validate a health economic model.

    Source: Eddy et al. 2012

  • What should a validation plan for a health economic model contain?

    A validation plan for a health economic model has no fixed template, so its contents rest on guidance such as the ISPOR-SMDM task force report by Eddy and colleagues. The plan states the intended use of the model and names the tests each output of interest will face. For each comparison it records the data source and why it was chosen, preferring sources with settings, populations, interventions and outcomes similar to those the model addresses. Each source is labelled dependent, partially dependent or independent, so a reader can see whether it also helped to build the model. For a model used in more than one application, the plan says when validations should be repeated.

    Source: Eddy et al. 2012

  • Why should a validation plan be written before the results of a health economic model are known?

    Tests and data sources chosen after a modeller has seen the output of a health economic model can be picked because they agree with it, so a validation that looks successful may never have been able to fail. Eddy and colleagues state that, ideally, the validation plan and sources should be chosen before the results are known. They ask for sources to be justified by the intended use of the model, not by convenience or the likelihood of a successful validation, and suggest that an independent panel might make the choice. A dated validation plan lets a reader confirm that this order was kept.

    Source: Eddy et al. 2012

  • How is the acceptable range of accuracy set in a validation plan?

    Sargent defines the acceptable range of accuracy as the accuracy a model needs to be valid for its intended purpose, usually specified for each output of interest as a range for the difference between the model value and the real system value. His recommended procedure specifies the required accuracy before development starts or very early in it, so a validation plan for a health economic model can fix it in advance. In an illustrative survival model with a range of 0.03, modelled survival at each time point must lie within 0.03 of the observed proportion alive. Without a stated range, a comparison of model and data has no clear pass or fail.

    Source: Sargent 2011

  • How does a validation plan support a NICE technology appraisal?

    The NICE manual PMG36 does not use the term validation plan in its chapter on economic evaluation, although two paragraphs ask for what such a plan supplies. Paragraph 4.6.4 asks companies to detail the quality assurance methods used in developing the model and to provide the methods and results of model validation. Paragraph 4.6.20 asks that the external validity of an extrapolation be assessed by its clinical and biological plausibility and its coherence with external data sources such as historical cohort data sets. A dated validation plan lets the External Assessment Group check why each source was chosen and whether every planned test is reported, failures included.

    Source: NICE PMG36 (2022, updated 2026)

  • How often do health technology assessment submissions include a validation plan?

    Evidence from France suggests that few submissions do. Ghabri and colleagues describe a pilot study in which two health economists independently reviewed the 77 manufacturers' cost-effectiveness analyses received by the French National Authority for Health (HAS) between 2013 and 2017, and found a general lack of a validation plan or statistical rationale. Fewer than half reported a validation process, and only 35% performed any external validation. The authors suggest that model validation is a difficult step, perhaps because it takes extra time and needs external experts without conflicts of interest.

    Source: Ghabri et al. 2019

Trust Record

Verified by Dr Darrin Baines

British health economist

Professional identity: darrinbaines.org

Verification date: 12 Nov 2026

Content version: 1.0.0

Canonical Identity

Term code
HE-EM-MV-126

Stable URI · Machine-readable · Resolvable · CC BY 4.0

This article is licensed under Creative Commons Attribution 4.0 International (CC BY 4.0).

Author: Dr Darrin Baines · Publisher: Intelligent Parameters Ltd · Identifier: https://healtheconomics.wiki/concept/validation-plan