DMAIC

DMAIC is a five-phase Six Sigma method (define, measure, analyse, improve, control) that health services use to find and remove root causes of defects.

Status
Published, version 1.0.1
Last reviewed
7 Nov 2026, by Dr Darrin Baines
Report a problem
Tell us if something is wrong or out of date

Concept Architecture

DMAIC in Health Care Quality Improvement

DMAIC is a project method for repairing a health service process that already exists, such as theatre scheduling or medicines dispensing, by establishing what is going wrong before any change is tried. The letters stand for define, measure, analyse, improve and control, and the final stage exists to hold the gain once the project team has moved on. Health economists meet DMAIC mainly as the source of claims about saved bed days and lower costs, and those claims are often weaker than they look. Most published projects compare one site before and after the change, and few state how much money was saved.

How a manufacturing method reached the NHS

Monday traces Six Sigma to Walter Shewhart's work on process variation and to Bill Smith at Motorola in the 1980s, and reports that healthcare organisations had adopted DMAIC by the late 1990s. An NHS Improvement overview of October 2011 reports a two-year study of some 20 projects by the CHD Collaborative and the NHS Modernisation Agency, which placed the strength of Six Sigma in the five-stage process and its statistical measurement, analysis and control. Niñerola and colleagues found 196 articles on Six Sigma in health care published up to 2017, mostly from the USA.

The five stages and the economic task in each

The NHS Improvement overview sets out the purpose of each stage, summarised below. The economic tasks in the final column are added here for evaluators and do not come from the overview.

StagePurposeEconomic task
DefineSet a clear mandate based on a real problemState the perspective, the comparator and who gains or pays
MeasureUnderstand baseline performanceRecord baseline resource use and outcomes
AnalyseEstablish root causes and their effectSplit the cost of each failure into fixed and variable parts
ImproveDevelop, select and implement solutionsLog project staff time and the cost of each change
ControlEmbed the solution and keep controls in placeCost the monitoring and follow up long enough to show persistence

Monday notes that a change is not proposed until step 4 of 5, against step 2 of the plan-do-study-act cycle, and that process control is a required final step. Resource use can be captured with micro-costing or time-driven activity-based costing, and staff time given to the project carries an opportunity cost even when no money changes hands.

Scala and colleagues give a published example from an Italian university hospital. For patients over 65 with femur fracture, 468 patients before the change waited a mean of 5.62 days for surgery, against guidelines recommending two days. After a new care pathway, the control stage measured 365 patients at a mean of 3.45 days, a 39% reduction. The standard deviation rose from 3.24 to 3.60 days, so the average improved while the spread did not. The paper reports no cost of the pathway or the project.

What the sigma score measures and what it misses

The Analyse stage often converts performance into defects per million opportunities (DPMO), which is defects divided by opportunities and multiplied by one million, and then into a sigma level. The conversion passes through the normal distribution and adds a fixed allowance for drift.

σL=Φ−1(1−DPMO106)+1.5\sigma_{L} = \Phi^{-1}\left(1 - \frac{\text{DPMO}}{10^{6}}\right) + 1.5

where σL\sigma_{L} is the sigma level, Φ−1\Phi^{-1} is the inverse standard normal distribution function and 1.5 is the conventional drift allowance. Ialongo and Bernardini explain that a six sigma process is expected to miss with a probability of 0.00034% even after a 1.5 sigma drift, matching the 3.4 defects per million in the NHS Improvement overview.

The score weights every defect equally, so a late discharge letter and a wrong dose each count once although their costs and health consequences differ greatly. The score also sets no efficient target, since economic reasoning would stop reducing defects where the marginal cost of a further reduction equals the marginal value of the harm avoided. The NHS Improvement overview itself cautions that people get hung up on the sigma score, which it calls less important than achieving improvement.

What reviews say about these projects

Most reviews pool Six Sigma with Lean, so evidence on DMAIC alone is thin. Vest and Gamm found that only one of nine Six Sigma studies had a control group, and only a couple of the studies they reviewed stated how much money was saved or revenue gained. DelliFraine and colleagues identified 177 articles, only 34 of which reported any outcomes, and judged the evidence that these methods improve quality to be very weak. Glasgow and colleagues found follow-up data in 15 of 47 inpatient articles, with only 3 following up beyond two years.

Schretlen and colleagues give one of the fuller single-site reports, from a Dutch university hospital where about 20% of planned coronary bypass operations were cancelled at the last minute. Comparing 20 months before with 16 months after, they report 50% fewer cancellations and a 35% shorter referral to treatment time. They call the design an interrupted time series, yet, alongside control charts, tested with two-sample t-tests, which compare period means and cannot separate a change from a trend already under way. A before-and-after study of this kind is also exposed to regression to the mean, because projects tend to start when performance looks unusually poor.

Why a released theatre slot is not a cash saving

Marshall and Øvretveit, writing about the NHS, observe that savings from quality improvement are usually theoretical. Cash in end-of-year reports often requires a second cash change, such as closing beds, redeploying staff, cutting procurement or increasing production and income. They add that savings may fall to parties other than those who paid.

Schretlen and colleagues report 96 extra operations a year with EUR 1.15 million of additional revenue, and note that hospital costs on staff and theatres are generally incurred regardless of cancellations. That revenue is a gain to the hospital and a cost to the payer, so from a health system perspective the value lies in the health produced by the extra operations, net of the extra resources they use. A return on investment figure for the provider answers a narrower question. A cost-effectiveness analysis of reused capacity adds the project cost to the cost of the care that changes, as an evaluation of continuous quality improvement would.

ΔC=CP+CM+n (ce−s)\Delta C = C_{P} + C_{M} + n \, (c_{e} - s)

where ΔC\Delta C is the incremental cost over one year, CPC_{P} is the one-off project cost, CMC_{M} is the cost of control stage monitoring, nn is the number of failures avoided because of the project with each released slot reused, cec_{e} is the variable cost of the extra care in each slot and ss is the variable cost avoided per failure. With Δq\Delta q as the QALY gain per extra patient, the ICER is ΔC\Delta C divided by nΔqn \Delta q.

Worked example with day-of-surgery theatre cancellations

All numbers in this example are illustrative. A hospital schedules 2,400 elective operations a year and runs a DMAIC project on cancellations on the day of surgery, counting one defect opportunity per scheduled case.

1. Sigma levels. Cancellations fall by half, with 240 in the baseline year (DPMO 100,000) and 120 afterwards (DPMO 50,000). The sigma level moves up by 0.36, as 1.282 + 1.5 = 2.78 becomes 1.645 + 1.5 = 3.14.

2. Attribution. Similar hospitals with no project fall by 2.5 percentage points over the same period, and the hospital by 5. A difference-in-differences estimate therefore attributes 2,400 × 0.025 = 60 avoided cancellations to the project.

3. Headline saving. Each cancelled slot has an average cost of GBP 3,000, mostly staff and theatre overheads. The project report claims 120 × 3,000 = GBP 360,000. The attributable figure is 60 × 3,000 = GBP 180,000.

4. Project costs. Staff give 700 hours at GBP 45 an hour, or GBP 31,500, and training and data work add GBP 8,500, so CPC_{P} is GBP 40,000. Monitoring takes 150 hours a year, so CMC_{M} is 150 × 45 = GBP 6,750. The first-year total is GBP 46,750.

5. Cash position if nothing else changes. Theatre staffing is fixed in the short run, so only ss of GBP 150 per cancellation is avoided, for repeat tests and rebooking. That gives 60 × 150 = GBP 9,000 against GBP 46,750 of cost, a net cash cost of GBP 37,750.

6. Value if the slots are reused. The 60 slots treat extra patients from the waiting list, assumed otherwise to go untreated, at a variable cost cec_{e} of GBP 1,800, with Δq\Delta q of 0.40 QALYs each. The net cost per slot is 1,800 − 150 = GBP 1,650, and 60 × 1,650 = GBP 99,000. So ΔC\Delta C is 46,750 + 99,000 = GBP 145,750 for 60 × 0.40 = 24 QALYs, an ICER of 145,750 / 24 = GBP 6,073.

7. Against a yardstick. The NICE manual (PMG36) speaks of GBP 25,000 to GBP 35,000 per QALY for technology evaluations and allows net monetary benefit to be shown alongside ICERs. The lower figure is only a yardstick for a local project. Net monetary benefit is 24 × 25,000 − 145,750 = GBP 454,250.

8. The uncontrolled estimate. Using all 120 cancellations gives ΔC\Delta C of 46,750 + 198,000 = GBP 244,750 for 48 QALYs, an ICER of GBP 5,099 and net monetary benefit of 1,200,000 − 244,750 = GBP 955,250. The ratio falls by only 16% because most costs scale with nn, while net benefit more than doubles.

9. Interpretation. Each reused slot adds 0.40 × 25,000 − 1,650 = GBP 8,350 of net benefit, so GBP 46,750 of project cost is recovered after 46,750 / 8,350 = 5.6 attributable slots. The result depends far less on the project budget than on whether capacity is reused for patients who would otherwise go untreated, and on how long the gain lasts. The change in sigma level enters none of this.

DMAIC beside neighbouring methods and health technology assessment

Plan-do-study-act is a short test cycle, and the NHS Improvement overview lists it among the tools of the Improve stage, so one DMAIC project can contain several cycles. Statistical process control and its control chart sit inside the Analyse and Control stages.

Some authors use the cycle for health technology assessment. Ricciardi and colleagues compared two postoperative antibiotic protocols in one surgical department using length of stay. The study was retrospective and neither a cost per QALY nor protection against confounding comes from the cycle itself.

Limits and common misreadings

Most errors read a project report as if it were an evaluation. A fall in defects shows that something changed and settles little about cause or cash.

  1. Reading the Control stage as proof of persistence. Control data show persistence only when they run long enough. Scala and colleagues collected theirs retrospectively across four and a half years, which is unusual given the short follow-up Glasgow and colleagues found.
  2. Assuming all variation is waste. Monday notes that clinical recommendations are guides used with judgement, so some clinical practice variation may be justified.
  3. Assuming the method finds causes reliably. De Mast and Lokkerbol credit the statistical techniques and stage model, yet name weak support for problem diagnosis as the most prominent limitation.

Sources

  • de Mast J, Lokkerbol J. An analysis of the Six Sigma DMAIC method from the perspective of problem solving. International Journal of Production Economics. 2012;139(2):604-614. https://dare.uva.nl/id/d56ff77e-3649-466e-8297-7a249d94b202
  • DelliFraine JL, Langabeer JR, Nembhard IM. Assessing the evidence of Six Sigma and Lean in the health care industry. Quality Management in Health Care. 2010;19(3):211-225. https://doi.org/10.1097/QMH.0b013e3181eb140e
  • Glasgow JM, Scott-Caziewell JR, Kaboli PJ. Guiding inpatient quality improvement: a systematic review of Lean and Six Sigma. Joint Commission Journal on Quality and Patient Safety. 2010;36(12):533-540. https://doi.org/10.1016/S1553-7250(10)36081-8
  • Ialongo C, Bernardini S. Timeliness "at a glance": assessing the turnaround time through the six sigma metrics. Biochemia Medica. 2016;26(1):98-102. https://doi.org/10.11613/BM.2016.010
  • Marshall M, Øvretveit J. Can we save money by improving quality? BMJ Quality & Safety. 2011;20(4):293-296. https://doi.org/10.1136/bmjqs.2010.050237
  • Monday LM. Define, Measure, Analyze, Improve, Control (DMAIC) methodology as a roadmap in quality improvement. Global Journal on Quality and Safety in Healthcare. 2022;5(2):44-46. https://doi.org/10.36401/JQSH-22-X2
  • National Institute for Health and Care Excellence. NICE technology appraisal and highly specialised technologies guidance: the manual (PMG36). Published 31 January 2022, last updated 13 October 2026. Sections 4.2.16 and 6.3.7. https://www.nice.org.uk/process/pmg36
  • NHS Improvement. An overview of Six Sigma. October 2011. https://www.england.nhs.uk/improvement-hub/wp-content/uploads/sites/44/2018/06/An-overview-of-Six-Sigma.pdf
  • Niñerola A, Sánchez-Rebull MV, Hernández-Lara AB. Quality improvement in healthcare: Six Sigma systematic review. Health Policy. 2020;124(4):438-445. https://doi.org/10.1016/j.healthpol.2020.01.002
  • Ricciardi C, Orabona GD, Picone I, Latessa I, Fiorillo A, Sorrentino A, Triassi M, Improta G. A Health Technology Assessment in maxillofacial cancer surgery by using the Six Sigma methodology. International Journal of Environmental Research and Public Health. 2021;18(18):9846. https://doi.org/10.3390/ijerph18189846
  • Scala A, Ponsiglione AM, Loperto I, Della Vecchia A, Borrelli A, Russo G, Triassi M, Improta G. Lean Six Sigma approach for reducing length of hospital stay for patients with femur fracture in a university hospital. International Journal of Environmental Research and Public Health. 2021;18(6):2843. https://doi.org/10.3390/ijerph18062843
  • Schretlen S, Hoefsmit P, Kats S, van Merode G, Maessen J, Zandbergen R. Reducing surgical cancellations: a successful application of Lean Six Sigma in healthcare. BMJ Open Quality. 2021;10(3):e001342. https://doi.org/10.1136/bmjoq-2021-001342
  • Vest JR, Gamm LD. A critical review of the research literature on Six Sigma, Lean and StuderGroup's Hardwiring Excellence in the United States: the need to demonstrate and communicate the effectiveness of transformation strategies in healthcare. Implementation Science. 2009;4:35. https://doi.org/10.1186/1748-5908-4-35

Frequently Asked Questions (6)

  • What is DMAIC?

    DMAIC is a five-phase Six Sigma method (define, measure, analyse, improve, control) that health services use to find and remove root causes of defects.

    Source: NHS Improvement 2011

  • What five-phase Six Sigma methodology is DMAIC?

    The name is an acronym for define, measure, analyse, improve and control, the five stages of the improvement cycle at the centre of Six Sigma. Health services use it to repair a process that already exists, such as theatre scheduling or medicines dispensing, by finding the root causes of defects before any change is tried. An NHS Improvement overview of 2011 reports a two-year study of some 20 NHS projects, which placed the strength of Six Sigma in this five-stage process and its statistical measurement. The final stage exists to hold the gain once the project team has moved on.

    Source: NHS Improvement 2011

  • What are the phases of DMAIC?

    Define sets a clear mandate based on a real problem, and Measure establishes baseline performance. Analyse identifies root causes and their effect, often converting performance into defects per million opportunities and then a sigma level. Improve develops and implements the chosen solutions, with plan-do-study-act cycles and pilot studies among its tools. Control embeds the solution and keeps controls in place so that the gain lasts after the project ends. The NHS Improvement overview treats the sigma score produced along the way as less important than achieving the improvement itself.

    Source: NHS Improvement 2011

  • What is DMAIC used for?

    Its main use in health services is to fix a recurring failure in a process that already runs, with the cause established from data before any change is tried. Schretlen and colleagues used it in a Dutch university hospital where about 20% of planned coronary bypass operations were cancelled at the last minute, and reported 50% fewer cancellations after the project. Health economists meet DMAIC mainly through such reports of saved bed days and lower costs. Those claims need care, because most projects compare one site before and after the change, and released theatre capacity becomes a cash saving only if a second change follows, such as closing beds or treating extra patients in the freed slots.

    Source: Schretlen et al. 2021

  • What methodology does DMAIC belong to?

    Six Sigma, a quality method that began in manufacturing, is the parent methodology, and DMAIC is its core improvement cycle. Monday traces Six Sigma to Walter Shewhart's work on process variation and to Bill Smith, who applied the ideas at Motorola in the 1980s, and reports that healthcare organisations had adopted DMAIC by the late 1990s. In health care the method is often combined with Lean as Lean Six Sigma, so most reviews pool the two and evidence on DMAIC alone is thin. Monday also notes that process control is a required final step of the cycle.

    Source: Monday 2022

  • How does DMAIC relate to continuous quality improvement?

    Within continuous quality improvement, DMAIC is a structured project method that is often set beside the shorter plan-do-study-act cycle. Monday notes that DMAIC does not propose a change until the fourth of its five stages, against the second step of plan-do-study-act, and that it builds process control in as a required final step. The two methods can work together, since one DMAIC project can contain several plan-do-study-act cycles within its Improve stage. An economic evaluation of either kind of quality improvement adds the cost of the project itself to the cost of the care that changes.

    Source: Monday 2022

Trust Record

Verified by Dr Darrin Baines

British health economist

Professional identity: darrinbaines.org

Verification date: 7 Nov 2026

Content version: 1.0.1

Canonical Identity

Term code
HS-NHS-HQ-025

Stable URI · Machine-readable · Resolvable · CC BY 4.0

This article is licensed under Creative Commons Attribution 4.0 International (CC BY 4.0).

Author: Dr Darrin Baines · Publisher: Intelligent Parameters Ltd · Identifier: https://healtheconomics.wiki/concept/dmaic