Activity-Based Budgeting

Activity-based budgeting (ABB) builds a health service budget from forecast service volumes, the activities each needs and each activity's cost per unit.

Status
Published, version 1.0.5
Last reviewed
3 Oct 2026, by Dr Darrin Baines
Report a problem
Tell us if something is wrong or out of date

Concept Architecture

Activity-Based Budgeting from Forecast Activity and Cost Rates

An activity-based budget is built forward from the services a hospital, clinic or programme expects to deliver next year. Forecast volumes are converted into the activities those services require, and each activity is priced at a cost rate. The resulting budget can be traced line by line to planned clinical work, so a change in the activity plan changes the budget, which an uplift to last year's figure cannot show. Health services have often set budgets from precedent instead; a 1976 account from the Johns Hopkins Hospital observed that nursing budgets were usually justified "based on precedent and anecdote". The method is known as activity-based budgeting (ABB) and is distinct from activity-based costing, global budgets and activity-based funding.

From precedent to planned activity

The Chartered Institute of Management Accountants (CIMA) describes ABB as budgeting based on an activity framework, using cost driver data both to set the budget and to feed back variances. Its focus is on activities rather than functions. A departmental budget asks what the radiology department spent last year, whereas an activity-based budget asks how many scans, reports and patient preparations next year's referrals will generate. A 2019 technical article for the Association of Chartered Certified Accountants (ACCA) describes ABB as activity-based costing "in reverse", built on the same cost per driver.

That reversal is the central idea. Activity-based costing runs backwards from resources already consumed, assigning their cost to activities and then to services. ABB runs forwards from services to be delivered, through the activities they need, to the resources that must be supplied. The same activity map and cost driver rates serve both directions; CIMA notes that the most basic form of ABB takes its cost drivers from activity-based costing.

In health care the alternative is the incremental or line-item budget. The WHO and OECD review of payment methods describes line-item budgets as amounts for personnel, medicines and supplies "based on the previous year's budget allocation", valued for predictability and control but not linked to the type and volume of services provided. At Johns Hopkins, physicians and nurses instead drew up a list of the activities that should be performed for patients, used documented standard times for the tasks in physicians' orders and nursing care plans, and based budget decisions on the nursing functions the hospital wanted to perform. That "functional activity budgeting" is an early health service example of the method.

The calculation from volume, activity, time and cost rate

The arithmetic is a chain of multiplications summed over services and activities. A 2022 description of a time-driven activity-based management system for Chinese public hospitals sets out the steps, which are to determine the activities each medical service requires, forecast service demand for the next period, multiply activities per unit of service by forecast demand, convert that workload into working time, apply a cost per unit of time, and sum the results into the budget.

B=∑s∑aQs nsa ta ca+FB = \sum_{s} \sum_{a} Q_s \, n_{sa} \, t_a \, c_a + F

where BB is the budget for the period, QsQ_s is the forecast volume of service ss (for example new outpatient appointments), nsan_{sa} is the number of times activity aa is performed per unit of service ss, tat_a is the standard time for activity aa in minutes, cac_a is the cost per minute of the staff or equipment performing activity aa, and FF is any cost the organisation chooses to budget outside the activity framework, such as estates. Activities measured by counts rather than time, such as tests sent to a laboratory, use a cost per transaction in place of tacat_a c_a.

The product QsnsataQ_s n_{sa} t_a summed over services gives the resource time each staff group must supply. This is the planning output that an incremental budget never produces. Kaplan and Anderson, describing time-driven activity-based costing, note that managers can then forecast how much additional business existing capacity can absorb and where shortages will require extra spending. Comparing required time with the practical capacity of each staff group turns the budget into a staffing and capacity planning tool, with variances later analysed against the same drivers.

Worked example of an illustrative outpatient clinic

The following numbers are illustrative and do not describe a real service. A clinic forecasts 4,000 new appointments and 9,000 follow-ups next year. Each new appointment needs 30 consultant minutes, 20 nurse minutes and 10 administrative minutes; each follow-up needs 15, 10 and 5 minutes. Cost rates per minute are GBP 2.00 for consultants, GBP 0.80 for nurses and GBP 0.40 for administrative staff. For simplicity the example sets F=0F = 0 and treats each staff group as a single activity.

Staff groupMinutes requiredCost rate (GBP per minute)Budget (GBP)
Consultant255,0002.00510,000
Nurse170,0000.80136,000
Administrative85,0000.4034,000
Total680,000

The minutes come from the volume and time assumptions. Consultant time is 4,000 × 30 + 9,000 × 15 = 255,000 minutes (120,000 for new appointments and 135,000 for follow-ups); nurse time is 4,000 × 20 + 9,000 × 10 = 170,000 minutes; administrative time is 4,000 × 10 + 9,000 × 5 = 85,000 minutes. The budget is 255,000 × 2 + 170,000 × 0.8 + 85,000 × 0.4 = 680,000 GBP.

The capacity check carries most of the information. If the consultants' job plans supply 240,000 minutes of practical clinic capacity, the plan is short by 255,000 − 240,000 = 15,000 minutes, or 250 hours. If nurses supply 200,000 minutes, they have 200,000 − 170,000 = 30,000 minutes unused. Unless nursing hours are cut, the clinic still pays for those minutes (30,000 × 0.80 = GBP 24,000), so its cash requirement is above the GBP 680,000 activity-based figure. An incremental budget of last year's GBP 650,000 plus a 3% uplift gives 650,000 × 1.03 = 669,500 GBP, close to the activity-based total, yet it reveals neither the consultant shortfall nor the spare nursing time.

Suppose a pathway change removes 2,000 follow-ups. Required time falls by 2,000 × 15 = 30,000 consultant minutes, 2,000 × 10 = 20,000 nurse minutes and 2,000 × 5 = 10,000 administrative minutes, so the activity-based budget falls by 30,000 × 2 + 20,000 × 0.8 + 10,000 × 0.4 = 80,000 GBP (60,000 for consultants, 16,000 for nurses and 4,000 for administration), to 600,000 GBP. The consultant shortfall disappears (225,000 minutes required against 240,000 supplied). Of the GBP 80,000, GBP 30,000 is spending avoided, because the 15,000 extra consultant minutes no longer have to be bought. The remaining GBP 50,000 is capacity released (15,000 consultant minutes, a further 20,000 nurse minutes and 10,000 administrative minutes) and becomes cash only if the clinic reduces staffing or redeploys the time to other work.

Assumptions and choices that move the budget

An activity-based budget is only as good as four inputs. Each is a modelling choice, and each should be reported alongside the figure.

  • Volume forecast. Errors in QsQ_s pass straight through to every line, so ABB depends on credible demand forecasting for referrals, admissions and procedures.
  • Activity definitions and standard times. The Johns Hopkins account found the day-to-day and patient-to-patient variability of tasks was the source of most staffing problems. A single average time per service misstates cost when case mix shifts, so activity times may need to be set separately for groups of patients of different complexity.
  • Capacity basis of the cost rate. Kaplan and Anderson argue that cost driver rates should be calculated at practical capacity, not at actual utilisation, and that practical capacity is often estimated at around 80% or 85% of theoretical capacity. Rates computed from actual use load the cost of idle time onto each activity and overstate the budget required for a given volume.
  • Treatment of fixed and semi-fixed costs. Staff on contracts, buildings and equipment do not flex with small volume changes. Dredge's World Bank guide to hospital global budgeting notes that once fixed and semi-fixed costs are recovered in the initial agreement in a purchaser contract, additional in-year activity should be recovered at marginal cost only.

Standard times can be engineered from observation, taken from current practice or set from what clinicians agree should happen, a choice close to that made in standard costing. Simborg noted that patient classification methods had not been widely adopted because they tend to formalise existing staffing patterns; the Johns Hopkins team instead listed the activities that should be performed.

How it differs from activity-based costing, global budgets and activity-based funding

Several neighbouring terms share the word activity or the word budget, and they answer different questions. ABB is an internal planning method; the others are a costing method, a purchaser's budget format and a payment mechanism.

  • Activity-based costing measures what services cost, after the event. ABB uses its activity map and rates to plan forward.
  • Global budgets are set by the purchaser. The World Bank provider payment manuals define a hospital global budget as a payment fixed in advance to cover a hospital's aggregate expenditure on an agreed set of services, based on inputs, outputs or both; Dredge summarises the arithmetic as budget = price × volume, so a hospital that lowers unit costs can deliver more within the same sum. A hospital under a global budget can still use ABB internally to decide how the fixed sum is spread across services.
  • Activity-based funding pays providers per case, for example through diagnosis-related group tariffs, so hospital income follows activity. The WHO and OECD review notes that in many settings diagnosis-related groups have replaced global budgets in order to reward hospital activity. Under such provider payment arrangements, ABB is the provider's internal counterpart. It estimates whether the planned activity can be delivered within the income it will earn.
  • Budget impact analysis estimates how adopting a new technology changes a budget holder's spending. Activity cost rates from an ABB system can supply local unit costs for such an analysis, but the two answer different questions.

Using activity-based budgets in economic evaluation and planning

An activity-based budget records planned financial outlays at budgeted rates. Those figures are accounting costs, and they approximate the opportunity cost of resources only where the rates reflect resources actually released or consumed. For economic evaluation, activity cost rates can be a defensible source of local unit costs, provided they are calculated at practical capacity and the analyst states which overheads are included.

The averages in an ABB system are not marginal costs. The worked example shows the gap. Removing 2,000 follow-ups lowers the budgeted resource requirement by GBP 80,000, but the cash saving may be much smaller (in the example, GBP 30,000 rather than GBP 80,000) if staff remain in post. A cost-effectiveness or budget impact claim built on activity-based rates should therefore say whether the released capacity is assumed to be removed, redeployed or left idle.

Limitations and common misreadings

The method has real costs and some predictable failure modes. Most concern the effort of building it, the forecasts it rests on and confusion with similarly named terms.

  • Effort. The ACCA article notes that ABB requires detailed analysis of overheads and measurement of activities, which can be complex, costly and time-consuming, and that where direct costs dominate and the range of services is narrow, the costs may outweigh the benefits.
  • Forecast risk. Because every line is volume-driven, a mistaken referral forecast misstates the whole budget. Dredge recommends that global budgets include a mechanism to adjust for differences between the planned and the delivered volume of services.
  • Confusing ABB with activity-based funding. A hospital paid per case is not thereby using activity-based budgeting, and a hospital on a global budget can use ABB internally.

Sources

Library

Publications

6
  • Report

    Price setting and price regulation in health care: lessons for advancing universal health coverage — Barber SL, Lorenzoni L, Ong P, Chapter 3, Payment methods ed., 2019 (World Health Organization and Organisation for Economic Co-operation and Development)

    Joint WHO and OECD report on price setting in health care, whose chapter on payment methods is cited for describing line-item budgets as input amounts based on the previous year's allocation, valued for predictability and control but not linked to the type and volume of services, and for noting that DRGs have replaced global budgets in many settings to reward hospital activity.

  • Journal article

    Research on time-driven activity-based management system of public hospitals — Jiang Q, Zhu X, Chen L, Zhao Z, Chen Y, Vol. 9, Article 763829 ed., 2022 (Frontiers in Public Health)

    Study establishing a time-driven activity-based management system for public hospitals, cited for its steps for hospital activity-based budgeting, from determining the activities each service needs and forecasting demand to converting the predicted activity time into cost and summing operating costs into a budget target.

  • Journal article

    Rational staffing of hospital nursing services by functional activity budgeting — Simborg DW, Vol. 91, No. 2, pp. 118-121 ed., 1976 (Public Health Reports)

    Account of functional activity budgeting for nursing services at the Johns Hopkins Hospital, cited for observing that nursing budgets were usually justified by precedent and anecdote, for physicians and nurses listing the activities that should be performed, with documented standard task times, and for basing budget decisions on the nursing functions the hospital wanted to perform.

  • Other

    Activity-based budgeting (ABB) — Chartered Institute of Management Accountants, Resource article, 10 June 2013 ed., 2013 (AICPA and CIMA)

    Resource article from the Chartered Institute of Management Accountants on activity-based budgeting, cited for the CIMA Official Terminology definition of budgeting based on an activity framework that uses cost driver data in budget setting and variance feedback, and for its point that the method focuses on activities rather than functions, using drivers identified through activity-based costing.

  • Other

    All about budgeting, part 3 — Willis S, Student Accountant technical article, Performance Management; page last modified 20 March 2019 ed., 2019 (ACCA)

    ACCA Student Accountant technical article on budgeting, cited for describing activity-based budgeting as activity-based costing in reverse, built on a cost per driver, and for warning that its detailed analysis of overheads is complex, costly and time-consuming and may not pay where direct costs dominate and the product range is narrow.

  • Report

    Hospital global budgeting — Dredge R, Health, Nutrition and Population Discussion Paper, September 2004 ed., 2004 (World Bank)

    World Bank discussion paper on hospital global budgeting, cited for expressing a budget as price times volume so that lower unit costs allow more services within the same sum, for recovering additional in-year activity at marginal cost once fixed and semi-fixed costs are covered in the initial contract, and for adjusting budgets for planned versus delivered volume and case mix.

Frequently Asked Questions (6)

  • What is an activity-based budget?

    Activity-based budgeting (ABB) builds a health service budget from forecast service volumes, the activities each needs and each activity's cost per unit.

    Source: Jiang et al. 2022

  • How does an activity-based budget differ from budgeting on historical spending?

    Incremental budgeting starts from what was spent last year and adjusts for expected changes in prices and volumes, which carries forward whatever inefficiency and misallocation the base period contained. Activity-based budgeting starts instead from the volume of services expected to be delivered, works out the activities required to deliver them, and derives the resources each activity consumes. The result is a budget that can be traced to planned output, and that changes when the planned output changes rather than when last year's figure is uplifted.

    Source: Horngren, Datar & Rajan 2015

  • How is activity-based budget constructed?

    The steps are to identify the activities involved in delivering the service, to establish for each a driver that measures how much of it is consumed, to determine the cost of a unit of each activity from the staff time, consumables, equipment and overhead it uses, and then to multiply unit costs by the volumes forecast for the coming period. Overhead is attached to activities through the driver rather than spread as a uniform percentage, which is the feature that distinguishes the resulting figures from those produced by traditional absorption.

    Source: Horngren, Datar & Rajan 2015

  • What makes a good cost driver in an activity-based budget?

    A driver must be measurable from data the organisation already collects or can reasonably collect, and it must bear a causal relation to the resources consumed rather than merely correlating with them, so that a change in the driver genuinely implies a change in cost. In clinical settings the drivers that perform best are usually measures of time, such as staff minutes in a theatre or a clinic room, because time is what most resources are consumed in. Drivers based on counts of patients or episodes perform poorly where cases vary substantially in complexity.

    Source: Kaplan & Anderson 2004

  • Where is activity-based budget used in health services?

    It underlies patient-level costing systems, which build the cost of an episode from the activities the patient actually received rather than allocating a departmental average, and it supports service line reporting that compares the cost of delivering a pathway against the income it attracts. It is used in capacity planning, since expressing a budget in activities makes the staffing and equipment implications of a change in volume explicit. It also underpins tariff and reference cost construction, where a national price must reflect the resources a service typically consumes.

    Source: Kaplan & Porter 2011

  • What are the limitations of activity-based budget?

    Building and maintaining the system is demanding, since activities must be defined, drivers measured and unit costs kept current, and the effort is frequently underestimated. Costs that do not vary with activity in the short run, including buildings, equipment already purchased and much of the establishment, are attached to activities and therefore appear variable when they are not, so a projected saving from reducing volume may not be realised. Where budgets follow measured activity, there is also an incentive to record activity in the way that attracts most resource, which requires the definitions to be audited.

    Source: healtheconomics.wiki

Trust Record

Not verified for this version

This concept changed after its last verification. Re-verify to stamp this version.

Canonical Identity

Term code
HE-EE-BIA-001

Stable URI · Machine-readable · Resolvable · CC BY 4.0

This article is licensed under Creative Commons Attribution 4.0 International (CC BY 4.0).

Author: Dr Darrin Baines · Publisher: Intelligent Parameters Ltd · Identifier: https://healtheconomics.wiki/concept/activity-based-budget