Author-reviewedEvidence: highv1.0.1

Model Acceptance Testing

Model acceptance testing is the final test of a finished health economic model by its sponsor, or a third party it hires, before the results are used.

Status
Published, version 1.0.1
Last reviewed
12 Nov 2026, by Dr Darrin Baines
Report a problem
Tell us if something is wrong or out of date

Concept Architecture

Model Acceptance Testing for Health Economic Models

Model acceptance testing is the last round of testing a decision model goes through before the organisation that commissioned it agrees to rely on its results. Balci's simulation testing framework, which takes the term from software testing, places it at the fifth and final level of model testing and gives it to the sponsor of the study or to an independent third party the sponsor hires. In health economics the idea applies wherever one party builds a health economic model and another pays for it or acts on it, for example a manufacturer that commissions a cost-effectiveness model from a consultancy. The phrase is rare in health economics validation papers, and neither the AdViSHE tool nor the TECH-VER checklist has an item with that name.

Five levels of testing with acceptance last

Balci describes five levels of testing in a simulation model's life cycle. Private testing is done informally by the modeller. Submodel testing, integration testing and model testing are planned, performed and documented by a quality assurance group inside the developer's organisation but independent of the project team. These levels check each part on its own, the joins between parts and the validity of the overall model behaviour. Acceptance testing comes fifth, and its stated objective is to establish sufficient credibility of the model so that its results can be accepted and used by the sponsor.

In a decision model, testing each module by itself is unit testing, and checks that the parts fit together belong to technical verification, which asks whether the model was built right, while Balci's fourth level judges the validity of overall model behaviour. Model validation asks whether the model is the right one for the decision. Acceptance testing draws on both. Balci describes it as an operational test using the actual hardware and actual data to determine whether all requirements in the contract are satisfied, and his principles add that model validity is necessary but not sufficient for the credibility and acceptability of results.

Who runs the test and why independence matters

Balci assigns acceptance testing to the sponsor, who documents the tests and specifies the test cases or data, and recommends that the acceptance test plan form part of the contract, or of the requirements specification when the study is run in house. The sponsor may run the tests itself, or the developer's quality assurance group may run them in front of client representatives, but Balci recommends an independent third party contracted by the sponsor, so that the organisation conducting the study cannot claim the sponsor is biased. Balci's wider case for independent testing is developer bias, since the developer who knows the model best may be the least independent tester, and a contracted organisation may fear that negative results will cost it future contracts.

Health economists meet the same tension from the side of the model user. Vemer and colleagues, introducing AdViSHE, note that reimbursement decision makers could simply presume a model valid, that this unquestioning acceptance may reduce users' confidence in the model, especially when the modelling team has an economic interest in favourable outcomes, and that model users therefore often validate models themselves. AdViSHE calculates no final validation score and leaves the assessment to the model users, and TECH-VER, which gives no score either, aims among other things to assist the end user's final judgement on a model's verification status. Corro Ramos and colleagues write that the field needs more consensus on whether independent third parties should conduct validations or clear reporting by developers is enough. In the independent verification and validation Sargent describes, the third party is independent of both the developers and the sponsor or user, whereas Balci's acceptance tester works for the sponsor.

Acceptance before and after a NICE submission

In a NICE technology appraisal the company is the sponsor of its own model whether it builds the model in house or commissions it, so any acceptance testing takes place before submission. NICE PMG36 (2022, updated 2026), section 4.6.4, asks for the methods of quality assurance used in developing the model and the methods and results of model validation, which is where evidence from acceptance tests can be reported. Under section 5.5.15 a company submitting a fully executable model must give NICE full access to the code and should make sure the submitted model matches the written submission, which an acceptance test of the submission version can check.

After submission the External Assessment Group critically evaluates the evidence submission and may amend the company's model in exploratory analyses (PMG36 section 5.6.15). Its review resembles acceptance testing in purpose, since someone other than the developer judges whether the results can be relied on. It works on behalf of NICE, though, with no contract with the company and no acceptance criteria agreed in advance, so it fits the user validation that Vemer and colleagues describe better than Balci's sponsor test, and Corro Ramos and colleagues cite NICE External Assessment Groups as external independent validators without conflicts of interest.

Building an acceptance test plan for a decision model

An acceptance test plan turns the commissioning requirements into tests whose pass criteria are fixed before the model is delivered. Balci asks for well documented test cases specified by the sponsor, and Sargent recommends stating for each output variable of interest an acceptable range of accuracy, the accuracy the model needs to be valid for its intended purpose. A plan for a cost-effectiveness model can rerun earlier tests on the delivered version.

1. Requirements check. The delivered model is compared with the agreed comparators, population, time horizon and software.

2. Verification tests. Known-answer black-box tests, such as equal effectiveness and equal cost in both arms giving zero incremental QALYs and costs, and a hand calculation of the first cycle.

3. Validation tests. External validation of key outputs against data the developer did not use and the acceptable range in the plan, with a face validity review of assumptions.

4. Decision record. A signed record states which tests passed and whether the model is accepted, accepted with conditions or returned.

Worked example with a commissioned three-state Markov model

All numbers here are illustrative. A company commissions a three-state Markov cohort model with Well, Progressed and Dead states and annual cycles. The contract sets three acceptance tests, a tolerance of 0.001 QALYs for the hand calculation and an acceptable range of 3 percentage points for five-year overall survival in the comparator arm.

Test 1, equal effectiveness. The treatment hazard ratio is set to 1 and every treatment-specific cost and utility input, including the drug price, is set to the comparator value. The expected result is zero incremental QALYs and an incremental cost of GBP 0, the delivered model returns both, and the test passes.

Test 2, first-cycle QALYs. The plan specifies end-of-cycle counting with no half-cycle correction and no discounting in this test.

Q1=NWuW+NPuPN0×tQ_1 = \frac{N_W u_W + N_P u_P}{N_0} \times t

where Q1Q_1 is the QALYs per person in the first cycle, N0N_0 is the cohort size at the start, NWN_W and NPN_P are the numbers in Well and Progressed at the end of the cycle, uWu_W and uPu_P are the utility values of those states, and tt is the cycle length in years.

The cohort is 1,000 people in Well, with annual transition probabilities of 0.15 to Progressed and 0.02 to Dead. So NWN_W is 1,000 multiplied by 1 minus 0.15 minus 0.02, which is 830, and NPN_P is 150. With uWu_W equal to 0.80, uPu_P equal to 0.60 and tt equal to 1, the numerator is 830 multiplied by 0.80, or 664, plus 150 multiplied by 0.60, or 90, giving 754, and Q1Q_1 is 754 divided by 1,000, or 0.754. The delivered model returns 0.770, a gap of 0.016, far above the tolerance. The cells show the 20 people who died still accruing the Well utility, since 850 multiplied by 0.80 is 680, plus 90 gives 770, and 770 divided by 1,000 is 0.770. The test fails on a verification error.

Test 3, five-year survival. Modelled five-year overall survival in the comparator arm is compared with a registry that was not used to build the model, chosen when the plan was written because its patients and care resemble the modelled population, as Eddy and colleagues advise for validation sources.

∣Sm−So∣≤δ\left| S_m - S_o \right| \le \delta

where SmS_m is the modelled five-year survival, SoS_o is the observed five-year survival and δ\delta is the acceptable range set in the plan.

The model gives 41% and the registry 46%, a difference of 5 percentage points, larger than the 3 points allowed. This is a validation failure, and fixing the error in Test 2 does not touch it, because that error changes QALYs and not survival.

Decision. The sponsor returns the model. The developer corrects the utility error and revises the survival extrapolation or explains the gap, and the sponsor judges that explanation. All three tests are rerun on the new version, and the signed record names the version accepted.

Neighbouring terms and other meanings

Sargent quotes a United States defence definition of accreditation as the official certification that a model and its data are acceptable for use for a specific application, and notes that the evaluation is usually conducted by a third party. Acceptance testing supplies one kind of evidence for such a decision, and model accreditation has no health economics page of its own. Rerunning earlier tests after a change is regression testing, and a model audit by someone outside the build can feed an acceptance decision without being one.

In software practice the term can also name automated tests. Hamilton and colleagues, building R modules for health economic models, use acceptance tests to check the output when several code components run together to meet core user requirements, rerun through continuous integration on every edit, which makes them developer tests rather than a sponsor's sign-off. The FDA's software validation guidance lists the user acceptance test among the names for user site testing, which should follow a predefined written plan with a record of formal acceptance.

Limits of a passed acceptance test

Balci judges the degree of credibility a model reaches against the study objectives, so an accepted model is judged sufficiently credible only for those stated objectives. If the objectives or the system are defined wrongly, a model can be found sufficiently valid and still give invalid results, and Balci calls solving the wrong problem a Type III error. Acceptance tests written from a flawed specification can pass a model that answers the wrong question.

The main risk the test controls is accepting invalid results as if they were sufficiently valid, Balci's Type II error, and Sargent says this model user's risk must be kept small. A manufacturer that accepts its own commissioned model has an interest in the result, so its acceptance closes only the sponsor's side of credibility assessment and does not bind the HTA body or replace its review.

Sources

  • Balci O. Verification, validation, and testing. In: Banks J, ed. Handbook of Simulation: Principles, Methodology, Advances, Applications, and Practice. New York: John Wiley & Sons; 1998:335-393. https://doi.org/10.1002/9780470172445.ch10
  • Büyükkaramikli NC, Rutten-van Mölken MPMH, Severens JL, Al M. TECH-VER: a verification checklist to reduce errors in models and improve their credibility. PharmacoEconomics. 2019;37(11):1391-1408. https://doi.org/10.1007/s40273-019-00844-y
  • Corro Ramos I, Feenstra T, Ghabri S, Al M. Evaluating the validation process: embracing complexity and transparency in health economic modelling. PharmacoEconomics. 2024;42:715-719. https://doi.org/10.1007/s40273-024-01364-0
  • Eddy DM, Hollingworth W, Caro JJ, Tsevat J, McDonald KM, Wong JB. Model transparency and validation: a report of the ISPOR-SMDM Modeling Good Research Practices Task Force-7. Value in Health. 2012;15(6):843-850. https://doi.org/10.1016/j.jval.2012.04.012
  • Hamilton MP, Gao C, Wiesner G, Filia KM, Menssink JM, Plencnerova P, et al. A prototype software framework for transferable computational health economic models and its early application in youth mental health. PharmacoEconomics. 2024;42(8):833-842. https://doi.org/10.1007/s40273-024-01378-8
  • National Institute for Health and Care Excellence. NICE technology appraisal and highly specialised technologies guidance: the manual (PMG36). Published 31 January 2022, last updated 13 October 2026. Sections 4.6.4, 5.5.15 and 5.6.15. https://www.nice.org.uk/process/pmg36
  • Sargent RG. Verification and validation of simulation models. In: Proceedings of the 2011 Winter Simulation Conference. 2011:183-198. https://www.informs-sim.org/wsc11papers/016.pdf
  • US Food and Drug Administration. General Principles of Software Validation; Final Guidance for Industry and FDA Staff. 11 January 2002. Section 5.2.6. https://www.fda.gov/media/73141/download
  • Vemer P, Corro Ramos I, van Voorn GAK, Al MJ, Feenstra TL. AdViSHE: a validation-assessment tool of health-economic models for decision makers and model users. PharmacoEconomics. 2016;34(4):349-361. https://doi.org/10.1007/s40273-015-0327-2

Frequently Asked Questions (6)

  • What is acceptance testing in modelling?

    Model acceptance testing is the final test of a finished health economic model by its sponsor, or a third party it hires, before the results are used.

    Source: Balci 1998

  • How does acceptance testing differ from technical verification?

    Technical verification is the developer's check that a health economic model was built right, while model acceptance testing is the sponsor's check that the delivered model meets what was commissioned. In Balci's framework, a quality assurance group inside the developer's organisation tests each submodel, the joins between them and the behaviour of the whole model, checking it against the contract to prepare for acceptance. Acceptance testing comes last and belongs to the sponsor or an independent third party it hires, and Balci recommends the third party so that the developer cannot claim the sponsor is biased. A model free of coding errors can still fail acceptance if it leaves out a comparator the contract named.

    Source: Balci 1998

  • What does acceptance testing involve?

    For a health economic model, acceptance testing runs against a plan whose test cases and pass criteria are fixed before the model is delivered, and Balci recommends that this plan form part of the contract between sponsor and developer. He describes the test as an operational test of the delivered model using the actual hardware and actual data, to determine whether every requirement in the contract is satisfied. For a cost-effectiveness model the plan can confirm the agreed comparators and time horizon, rerun known-answer tests such as equal effectiveness giving zero incremental QALYs, and compare key outputs with data the developer did not use. A signed record then states the outcome and names the version accepted.

    Source: Balci 1998

  • Why is acceptance testing important?

    Acceptance testing gives the organisation that pays for or acts on a health economic model a check of its own before decisions rest on the results. Sargent calls the probability of accepting the validity of an invalid model the model user's risk and says it must be kept small. He also recommends stating, for each output of interest, an acceptable range of accuracy for the model's intended purpose, so an acceptance plan can agree its pass criteria before anyone sees the results. A manufacturer that accepts its own commissioned model still has an interest in the result, so that acceptance does not bind an HTA body reviewing the submission.

    Source: Sargent 2011

  • How does acceptance testing relate to other validation steps?

    Acceptance testing comes after the developer's own checks of a health economic model and draws on both verification and validation. Testing each module alone is unit testing, and checking that the parts fit together is part of technical verification, which asks whether the model was built right. Model validation asks whether the model is the right one for the decision. An acceptance plan can rerun known-answer verification tests on the delivered version and add validation tests against data the developer did not use. One stated aim of the TECH-VER checklist is to assist the end user's final judgement on a model's verification status, a judgement that an acceptance decision can draw on.

    Source: Büyükkaramikli et al. 2019

  • Who is involved in acceptance testing?

    In a NICE technology appraisal the company is the sponsor of its own model, whether it builds the model in house or commissions it, so any acceptance testing by the sponsor happens before submission. NICE PMG36 asks the company to describe the quality assurance used in developing the model and the methods and results of model validation, and to make sure a submitted executable model matches the written submission. The External Assessment Group then critically evaluates the evidence submission and may amend the company's model in exploratory analyses. It works on behalf of NICE with no contract or agreed acceptance criteria, so its review is closer to validation by the model user than to a sponsor's acceptance test.

    Source: NICE PMG36 (2022, updated 2026)

Trust Record

Verified by Dr Darrin Baines

British health economist

Professional identity: darrinbaines.org

Verification date: 12 Nov 2026

Content version: 1.0.1

Canonical Identity

Term code
HE-EM-MV-001

Stable URI · Machine-readable · Resolvable · CC BY 4.0

This article is licensed under Creative Commons Attribution 4.0 International (CC BY 4.0).

Author: Dr Darrin Baines · Publisher: Intelligent Parameters Ltd · Identifier: https://healtheconomics.wiki/concept/acceptance-testing