Average cost with its average fixed and average variable parts

Adds the fixed and variable cost of a service in a period into total cost and divides by the units of activity delivered in the same period. The result splits into an average fixed part, the form of HE-FM-BTO-005 for one bed over its discharges, and an average variable part, whose sum is the average cost, and the whole average with cases as output is the crude cost per case inside HE-FM-CMAD-001. With a constant variable cost v per unit, VC is v times Q and the formula reads AC = FC / Q + v (derived), so while fixed cost stays above zero and unchanged, average cost falls as output rises because only the fixed part is spread more thinly. At the break-even volume of HE-FM-BEA-002 this average equals the price per unit (derived). Average cost describes the units already produced, and the cost of a change in activity is a separate quantity, set beside it in HE-CF-AVEC-001.

Signature

TC = FC + VC; AFC = FC / Q; AVC = VC / Q; AC = TC / Q
Inputs
InputsDefinitionUnit
FCCost that does not change with output in the period, such as rooms, equipment, a staffed session and the overhead share allocated to the service, at least 0currency per period
VCTotal cost in the period that changes with output, such as consumables, at the output Q, at least 0. It is the whole amount and not a cost per unitcurrency per period
QUnits of activity delivered in the same period, in one stated unit such as attendances, spells or bed days, above zerounits of activity per period
Output
TCAll resource cost of the service in the period, the sum of fixed and variable costcurrency per period, in a stated price year
AFCFixed cost over output, which falls as output rises while fixed cost is above zero and unchangedcurrency per unit of activity
AVCVariable cost over output, equal to the variable cost per unit when that cost is constantcurrency per unit of activity
ACAverage total cost, total cost over output, the average fixed part plus the average variable partcurrency per unit of activity

Function

Average cost function of a health service

Maps the fixed cost, variable cost and output of a health service in a period to its total cost, average cost and the average fixed and average variable parts of that average. Live records hold the neighbouring quantities and are cited, not restated. HE-FM-COST-001 builds a total cost from resource quantities and unit costs, and HE-FM-COST-003 and HE-CF-ANLS-001 give annual capital charges that can enter the fixed cost. The fixed cost of one bed over its discharges is HE-FM-BTO-005, a provider's crude cost per case appears inside HE-FM-CMAD-001, a health system's spending per relative value unit is HE-FM-CVF-004, labour cost per unit, which is average variable cost when labour is the only variable input, is the w/a_h stated in the Content of HE-FM-BAUM-001, and the outcome-side counterpart, cost per unit of health effect, is HE-FM-ACER-001. With a constant variable cost per unit, HE-FM-BEA-002 returns the volume at which average cost equals the price (derived). Marginal cost as a change in total cost over a change in output has the difference-quotient form of HE-FM-ICER-001 with output in place of health effect, and valuing released bed days at an average or a marginal cost is HE-FM-ALOS-006, so both appear here only as steps of the cost schedule in HE-CF-AVEC-001. The long-run curve and economies of scale belong to the Cost Function concept. Notation follows the Average Cost article.

Computational function

  • Computational function for a cost schedule with average cost, marginal cost and the costing gap

    Takes a schedule of activity levels with the fixed and variable cost at each, the layout of Table 7.10 in Greenlaw and colleagues, and returns total cost, average cost and the marginal cost of each block of activity, the lowest average cost and the activity where it occurs, and the gap between costing a change at the average and its actual cost. Average cost at each level is HE-FM-AVEC-001. The marginal cost of a block has the difference-quotient form of HE-FM-ICER-001 with output in place of health effect, and the gap is the value of HE-FM-ALOS-006 at the marginal cost less its value at the average cost, with the activity released, the base level less the target level, in place of the bed days released (derived). A step in fixed cost enters as a level with a higher fixed cost, so the schedule needs no capacity rule. The calculator line writes out four levels, with the second as the base for a contraction and an expansion and the third as the base for the next expansion. Any number of levels and any base are in the Excel, R and Python code.

    Inputs and outputs: Q_1 to Q_4 are the activity levels in rising order, in units of activity per period; FC_1 to FC_4 and VC_1 to VC_4 are the fixed and variable cost at each level, in currency per period; TC_1 to TC_4 are total costs; AC_1 to AC_4 are average costs; MC_2 to MC_4 are marginal costs of the block that ends at that level, in currency per unit of activity; AC_min is the lowest average cost; G_down, G_up and G_next are the average-based estimate less the actual change in total cost for the moves level 2 to level 1, level 2 to level 3 and level 3 to level 4, in currency. On a contraction a negative gap means the estimate claims a larger saving than the actual one; on an expansion a positive gap means it overstates the extra cost and a negative gap that it understates it. In the code base and target are the positions of the two levels compared.

    Assumption: HE-AS-AVEC-001 to HE-AS-AVEC-004 hold at every level. Activity levels rise strictly, with all costs from the same period and price year. Each row's fixed cost is what that output actually needs, so a second team appears in the row that requires it.

    Worked example (Article's outpatient injection clinic): Marginal cost is GBP 50 within capacity and GBP 200 across the block that needs the second team, and the lowest average cost is GBP 110 at 10,000 attendances. Costing 2,000 fewer attendances at the average of GBP 125 claims GBP 250,000 where GBP 100,000 is saved, and costing 2,000 more overstates the extra cost by GBP 150,000, both as in the article. Costing the block beyond capacity at the average of GBP 110 gives GBP 220,000 against an actual GBP 400,000 (computed here). The figures are illustrative. Q_1 = 6000; Q_2 = 8000; Q_3 = 10000; Q_4 = 12000; FC_1 = 600000; FC_2 = 600000; FC_3 = 600000; FC_4 = 900000; VC_1 = 300000; VC_2 = 400000; VC_3 = 500000; VC_4 = 600000; TC_1 = 900000; TC_2 = 1000000; TC_3 = 1100000; TC_4 = 1500000; AC_1 = 150; AC_2 = 125; AC_3 = 110; AC_4 = 125; MC_2 = 50; MC_3 = 50; MC_4 = 200; AC_min = 110; G_down = -150000; G_up = 150000; G_next = -180000

    Worked example (Clip Joint rows of Greenlaw Table 7.10): At 40, 60, 72 and 80 haircuts the average costs and marginal costs agree with the table as rounded to cents there. The marginal cost of the block ending at 72 haircuts equals the average cost at 72, so the gap G_up is zero there (computed here). Q_1 = 40; Q_2 = 60; Q_3 = 72; Q_4 = 80; FC_1 = 160; FC_2 = 160; FC_3 = 160; FC_4 = 160; VC_1 = 160; VC_2 = 240; VC_3 = 320; VC_4 = 400; TC_1 = 320; TC_2 = 400; TC_3 = 480; TC_4 = 560; AC_1 = 8; AC_2 = 6.6667; AC_3 = 6.6667; AC_4 = 7; MC_2 = 4; MC_3 = 6.6667; MC_4 = 10; AC_min = 6.6667; G_down = -53.33; G_up = 0; G_next = -26.67

    Worked example (Limiting case with no fixed cost): With no fixed cost and GBP 50 of variable cost per attendance, average and marginal cost coincide at every level, so costing any change at the average is exact (derived, illustrative). Q_1 = 6000; Q_2 = 8000; Q_3 = 10000; Q_4 = 12000; FC_1 = 0; FC_2 = 0; FC_3 = 0; FC_4 = 0; VC_1 = 300000; VC_2 = 400000; VC_3 = 500000; VC_4 = 600000; TC_1 = 300000; TC_2 = 400000; TC_3 = 500000; TC_4 = 600000; AC_1 = 50; AC_2 = 50; AC_3 = 50; AC_4 = 50; MC_2 = 50; MC_3 = 50; MC_4 = 50; AC_min = 50; G_down = 0; G_up = 0; G_next = 0

    Excel: Enter the activity levels in rising order in A2:A5, name them ActivityColumn, and enter the costs in B2:B5 and C2:C5. Enter =B2+C2 in D2 and =D2/A2 in E2 and fill both down, naming D2:D5 TotalCostColumn and E2:E5 AverageCostColumn. Enter =(D3-D2)/(A3-A2) in F3, fill it down to F5, leave F2 empty and name F3:F5 MarginalCostColumn, so its first cell is the block ending at the second level. A cell named MinAverageCost holds =MIN(AverageCostColumn) and ActivityAtMinAverage holds =INDEX(ActivityColumn,MATCH(MinAverageCost,AverageCostColumn,0)), which returns the first level in a tie (60 haircuts in Table 7.10, where 60 and 72 share the lowest average). With the positions of the two levels in cells named BaseLevel and TargetLevel, ActualCostChange holds =INDEX(TotalCostColumn,TargetLevel)-INDEX(TotalCostColumn,BaseLevel), AverageBasedEstimate holds =INDEX(AverageCostColumn,BaseLevel)*(INDEX(ActivityColumn,TargetLevel)-INDEX(ActivityColumn,BaseLevel)) and CostingGap holds =AverageBasedEstimate-ActualCostChange. For a longer schedule extend the columns and the names to match; a named row with a blank activity cell returns #DIV/0! in AverageCostColumn, and MIN then returns the same error, while a blank fixed or variable cost counts as 0 with no warning.

    R: cost_schedule <- function(Q, FC, VC, base = 1, target = length(Q)) { TC <- FC+VC; AC <- ifelse(Q > 0, TC/Q, NA); dQ <- diff(Q); MC <- c(NA, ifelse(dQ > 0, diff(TC)/dQ, NA)); gap <- AC[base]*(Q[target]-Q[base])-(TC[target]-TC[base]); ok <- !all(is.na(AC)); list(table = data.frame(Q = Q, TC = TC, AC = AC, MC = MC), min_ac = if (ok) min(AC, na.rm = TRUE) else NA, q_min = if (ok) Q[which.min(AC)] else NA, gap = gap) } Called as cost_schedule(c(6000,8000,10000,12000), c(600000,600000,600000,900000), c(300000,400000,500000,600000), base = 2, target = 3) it gives AC of 150, 125, 110 and 125, MC of NA, 50, 50 and 200, min_ac of 110, q_min of 10000 and gap of 150000. A single level gives MC of NA and gap of 0, a zero activity level gives NA for its AC, a level that does not rise gives NA for its MC, a zero activity level at base gives NA for gap, and with every level at zero min_ac and q_min are NA.

    Python: def cost_schedule(Q, FC, VC, base=0, target=-1): TC = [f+v for f, v in zip(FC, VC)]; AC = [t/q if q > 0 else None for t, q in zip(TC, Q)]; MC = [None]+[(TC[i]-TC[i-1])/(Q[i]-Q[i-1]) if Q[i] > Q[i-1] else None for i in range(1, len(Q))]; ok = [i for i, a in enumerate(AC) if a is not None]; best = min(ok, key=AC.__getitem__) if ok else None; gap = AC[base]*(Q[target]-Q[base])-(TC[target]-TC[base]) if AC[base] is not None else None; return TC, AC, MC, AC[best] if ok else None, Q[best] if ok else None, gap Standard library only; positions start at 0, so cost_schedule([6000,8000,10000,12000], [600000,600000,600000,900000], [300000,400000,500000,600000], base=1, target=2) returns AC of 150.0, 125.0, 110.0 and 125.0, MC of None, 50.0, 50.0 and 200.0, lowest average 110.0 at 10000 and gap 150000.0. A single level gives MC of [None] and gap 0.0, a zero activity level gives None for its AC, a level that does not rise gives None for its MC, a zero activity level at base gives None for the gap, and with every level at zero the last three results are None.

    Test (Marginal cost across the second team): With the article's clinic in the four rows, the third cell of MarginalCostColumn is compared with the hand value 200. Expected result TRUE. FALSE shows a schedule that leaves the fixed cost at 600,000 in the last row, which returns 50, and a doubled (400) or halved (100) cell. Excel check =ABS(INDEX(MarginalCostColumn,3)-200)<0.005

    Test (Costing gap of an expansion within capacity): With the clinic, BaseLevel 2 and TargetLevel 3, CostingGap is compared with the article's overstatement of 150,000. Expected result TRUE. FALSE shows an estimate built on the marginal cost of 50, which returns 0, and a doubled (300,000) or halved (75,000) cell. Excel check =ABS(CostingGap-150000)<0.5

    Test (Greenlaw Table 7.10 at 40 and 60 haircuts): With the six rows of Table 7.10 in columns extended to row 7, the second cell of AverageCostColumn is compared with USD 8 and the second cell of MarginalCostColumn, the block of 40 to 60 haircuts, with USD 4, the values Greenlaw and colleagues give. Expected result TRUE. FALSE shows a doubled (16) or halved (4) average, and a doubled (8) or halved (2) marginal cost. Excel check =AND(ABS(INDEX(AverageCostColumn,2)-8)<0.005,ABS(INDEX(MarginalCostColumn,2)-4)<0.005)

    Test (Marginal and average cost meet at 72 haircuts): With the same six rows, the marginal cost of the block ending at 72 haircuts is compared with the average cost at 72, the quantity at which Greenlaw and colleagues place the intersection. Expected result TRUE. FALSE shows the next row, 10 against 7, and an average cell doubled (13.33) or halved (3.33). Excel check =ABS(INDEX(MarginalCostColumn,3)-INDEX(AverageCostColumn,4))<0.005

    Test (Activity at the lowest average cost): With the clinic in the four rows, ActivityAtMinAverage is compared with 10,000. Expected result TRUE. FALSE shows MAX used in place of MIN, which returns 6,000, and a doubled (20,000) or halved (5,000) cell. Excel check =ActivityAtMinAverage=10000

    Common error (Marginal cost in the first row of a schedule): Table 7.10 prints USD 15.00 as the marginal cost of the first row, the same as its average total cost there. Taken from zero output, where the USD 160 fixed cost is already present, the change in total cost over the change in output is (240 minus 160) / 16, or USD 5 (derived). The schedule here leaves the first level without a marginal cost unless a zero-output row is entered, and a zero-output row itself returns #DIV/0! in AverageCostColumn.

    Common error (Levels with falling output): Table 7.9 ends with seven barbers producing 82 haircuts, fewer than the 84 from six, and Table 7.10 omits that row. Kept in the schedule, the Excel column returns USD 80 over minus 2, or minus USD 40, which is not a marginal cost; the R and Python code return NA and None.

    Common error (Treating a block's marginal cost as the rate for later blocks): The GBP 200 across the second team combines the GBP 300,000 step with GBP 100,000 of consumables over 2,000 attendances. Once the second team is in place, further attendances within its capacity add only the GBP 50 of consumables (derived, illustrative), so each block is computed from its own two rows.

    Source: Greenlaw SA, Shapiro D, MacDonald D. Principles of Economics 3e. Houston, TX: OpenStax; 2022. Section 7.3, Costs in the Short Run, Tables 7.9 and 7.10, the text on the change in total cost over the change in quantity with the 40 to 60 haircut block at USD 4, and the Clear It Up feature on where marginal and average costs meet, which places the intersection at a quantity of 72. National Institute for Health and Care Excellence. NICE technology appraisal and highly specialised technologies guidance: the manual (PMG36). Published 31 January 2022, last updated 13 October 2026. Section 4.4.20, on an analysis using marginal costs supplied in addition to the analysis based on average costs where a technology is already recommended for another purpose and enough spare capacity exists.

    TC_1 = FC_1 + VC_1; TC_2 = FC_2 + VC_2; TC_3 = FC_3 + VC_3; TC_4 = FC_4 + VC_4; AC_1 = TC_1 / Q_1; AC_2 = TC_2 / Q_2; AC_3 = TC_3 / Q_3; AC_4 = TC_4 / Q_4; MC_2 = (TC_2 - TC_1) / (Q_2 - Q_1); MC_3 = (TC_3 - TC_2) / (Q_3 - Q_2); MC_4 = (TC_4 - TC_3) / (Q_4 - Q_3); AC_min = min(min(AC_1, AC_2), min(AC_3, AC_4)); G_down = AC_2 * (Q_1 - Q_2) - (TC_1 - TC_2); G_up = AC_2 * (Q_3 - Q_2) - (TC_3 - TC_2); G_next = AC_3 * (Q_4 - Q_3) - (TC_4 - TC_3)

Try this function

Implementations

  • Excel

    Average cost and its parts from three named cells

    With inputs in cells named FixedCost, VariableCost and ActivityVolume, the formula shown goes in a cell named AverageCost. A cell named TotalCost holds =FixedCost+VariableCost, AverageFixedCost holds =FixedCost/ActivityVolume and AverageVariableCost holds =VariableCost/ActivityVolume. A blank or zero ActivityVolume returns #DIV/0!. A blank FixedCost is treated as 0 with no warning, so the cell then returns the average variable cost alone. Text in any input returns #VALUE!.

    =(FixedCost+VariableCost)/ActivityVolume

Assumptions

  • Costs and output of the average taken from one period and one defined unit

    The numerator holds every resource the service used in the period and the denominator the output of that same period, in one defined unit of activity. A finished consultant episode, a spell, an attendance and a patient treated for a year give different averages for the same service, as the article notes.

  • Fixed cost in the average held constant within the capacity considered

    Greenlaw and colleagues define fixed costs as expenditures that do not change with production in the short run, because fixed inputs do not change. Above the capacity of the current fixed resources the fixed cost steps up, as in HE-AS-BEA-005, and FC must include the extra amount at any output that needs it.

  • Output above zero for an average cost

    Q must be above zero. At zero production fixed cost is still present, as Greenlaw and colleagues state, so total cost is positive while there is no output to divide it by and the average is undefined.

  • Apportionment of shared and fixed costs stated for the average

    The share of estates, management and other shared costs that enters FC is a choice and is reported, because it moves the average with no change in resource use. For a technology with several uses, PMG36 section 4.4.20 bases the average cost first on the expected use or throughput for the uses being evaluated, and section 4.4.21 allows sensitivity analyses that assign some fixed costs to other uses when there is evidence those uses also provide good value for money.

  • Average cost read as a description of units produced

    AC reports the cost per unit at the output observed. It gives the cost per unit of a change in activity when fixed and variable inputs all change in proportion, as with no fixed cost and a constant variable cost per unit, where average and marginal cost coincide at every output (derived). Elsewhere the two differ, except where the marginal cost of a block happens to meet the average, as at 72 haircuts in HE-CF-AVEC-001.

Worked examples

  • Outpatient injection clinic at 8,000 attendances

    In the article's illustrative clinic, fixed annual costs are GBP 600,000 and consumables cost GBP 50 per attendance, so variable cost at 8,000 attendances is GBP 400,000. Total cost is GBP 1,000,000 and average cost GBP 125, of which GBP 75 is fixed and GBP 50 variable.

    FC = 600000; VC = 400000; Q = 8000; TC = 1000000; AFC = 75; AVC = 50; AC = 125
  • Same clinic falling back to 6,000 attendances

    With 6,000 attendances the same fixed cost is shared among fewer units, so the fixed part rises to GBP 100 and average cost to GBP 150, as in the article, while the variable part stays at GBP 50. The figures are illustrative.

    FC = 600000; VC = 300000; Q = 6000; TC = 900000; AFC = 100; AVC = 50; AC = 150
  • Same clinic at its capacity of 10,000 attendances

    At the capacity of 10,000 attendances the fixed part is GBP 60 and average cost GBP 110, the lowest value in the article's table. The figures are illustrative.

    FC = 600000; VC = 500000; Q = 10000; TC = 1100000; AFC = 60; AVC = 50; AC = 110
  • Same clinic at 12,000 attendances with a second team

    Going beyond capacity needs a second team that adds GBP 300,000 of fixed cost, so at 12,000 attendances fixed cost is GBP 900,000 and average cost is back at GBP 125, as in the article. The figures are illustrative.

    FC = 900000; VC = 600000; Q = 12000; TC = 1500000; AFC = 75; AVC = 50; AC = 125
  • Clip Joint barber shop at 40 haircuts from Greenlaw Table 7.10

    The illustrative barber shop of Greenlaw and colleagues has a fixed cost of USD 160 a day and a variable cost of USD 160 at 40 haircuts. Total cost is USD 320 and average total cost USD 8, with average variable cost USD 4, the values in their Table 7.10. The average fixed part of USD 4 is computed here. It is included as a check of an implementation against a published table.

    FC = 160; VC = 160; Q = 40; TC = 320; AFC = 4; AVC = 4; AC = 8
  • Limiting case of an average cost with no fixed cost

    With no fixed cost and GBP 100,000 of variable cost over 2,000 attendances, the fixed part is zero and average cost equals average variable cost at GBP 50. The figures are illustrative and the case checks an implementation.

    FC = 0; VC = 100000; Q = 2000; TC = 100000; AFC = 0; AVC = 50; AC = 50

Common errors

  • Multiplying average cost by a change in activity

    In the article's clinic at 8,000 attendances, costing 2,000 extra attendances at the average of GBP 125 gives GBP 250,000 when total cost rises by GBP 100,000, an overstatement of GBP 150,000, which is 2,000 x 75, the units times the average fixed cost (derived). The same multiplication applied to 2,000 fewer attendances reports GBP 250,000 saved when the cash saving is GBP 100,000. The bed-day form of this error is HE-ER-ALOS-008, valued with HE-FM-ALOS-006.

  • Reading a rise in average cost as falling efficiency

    When the article's clinic loses 2,000 attendances its average cost rises by GBP 25, to GBP 150, although nothing about its practice has changed. The whole rise is the fixed part, GBP 75 becoming GBP 100, spread over fewer units.

  • Comparing average costs of providers without case mix, scale or apportionment

    A gap in average cost between providers can reflect case mix, scale or the apportionment of shared costs and not efficiency. NHS England states that prices calculated on average costs do not take account of cost differences between providers, even though some serve patients with more complex needs, and HE-FM-CMAD-001 sets crude cost per case against a case-mix adjusted index. Apportionment alone also moves the figure. Allocating a further GBP 120,000 of overheads to the clinic raises its average at 8,000 attendances to GBP 140, with identical resource use (illustrative, derived).

  • Taking costs and output for an average from different periods

    Dividing the clinic's annual cost of GBP 1,000,000 by one quarter's 2,000 attendances gives GBP 500 per attendance, four times the correct GBP 125 (illustrative). Annual costs are divided by annual activity, or both are converted to the same period.

  • Reading a programme average as the cost of the last increment

    Neuhauser and Lewicki reported of a six-test stool guaiac protocol that the marginal cost of the sixth test may be 20,000 times the average cost. Brown and Burrows later called the analysis incorrect because of two fundamental errors and, after correction, found the marginal cost quite modest. On either figure, an average cost per case detected over a whole programme does not give the cost of its last step, which HE-CF-AVEC-001 computes for a cost schedule.

Sources

  • Greenlaw and colleagues on short-run average and marginal cost

    Greenlaw SA, Shapiro D, MacDonald D. Principles of Economics 3e. Houston, TX: OpenStax; 2022. Section 7.3, Costs in the Short Run, subsections Fixed and Variable Costs and Average Total Cost, Average Variable Cost, Marginal Cost. Total costs are the sum of fixed and variable costs, average total cost is total cost divided by the quantity of output and average variable cost is variable cost divided by quantity. The section states that average total cost includes average variable cost and average fixed cost, and Tables 7.9 and 7.10 give the Clip Joint schedule. Writing average fixed cost as FC / Q is derived, as Table 7.10 has no column for it.

    View source →

  • PMG36 on average unit costs and shared technologies

    National Institute for Health and Care Excellence. NICE technology appraisal and highly specialised technologies guidance: the manual (PMG36). Published 31 January 2022, last updated 13 October 2026. Section 4.4.9 calls healthcare resource groups a valuable source of information for estimating resource use and says the national average unit cost of an HRG is reported through the annual collection of reference costs. Section 4.4.10 says HRG data may not be appropriate, for example when the mean cost does not reflect resource use with the new technology. Section 4.4.20 bases the average cost of a multiple-use technology first on expected use or throughput for the uses being evaluated, and says that, if the technology is already recommended for another purpose and enough spare capacity exists, an analysis using marginal costs may be supplied in addition. Section 4.4.21 allows sensitivity analyses that assign some fixed costs to other uses.

    View source →

  • NHS Payment Scheme on prices based on average costs

    NHS England. 2026/27 NHS Payment Scheme, August 2026 update (PRN02348). 2026. Section 8.3, PSS top-up payments, paragraph 109, states that NHSPS prices are calculated on the basis of average costs and so do not take account of cost differences between providers, even though some providers serve patients with more complex needs.

    View source →

  • Neuhauser and Lewicki on the sixth stool guaiac test

    Neuhauser D, Lewicki AM. N Engl J Med. 1975;293(5):226-228. doi:10.1056/NEJM197507312930504. The abstract states that the cost of detecting cancer rises exponentially, so that the marginal cost of the sixth test may be 20,000 times the average cost.

    View source →

  • Brown and Burrows on the correction to the sixth stool guaiac analysis

    Brown K, Burrows C. The sixth stool guaiac test: USD 47 million that never was. J Health Econ. 1990;9(4):429-445. doi:10.1016/0167-6296(90)90004-M. The abstract states that the analysis is incorrect because of two fundamental errors and that after correction the marginal cost is quite modest.

    View source →

Canonical Identity

Stable URI · Machine-readable · Resolvable · CC BY 4.0

This formula is licensed under Creative Commons Attribution 4.0 International (CC BY 4.0).

Author: Dr Darrin Baines · Publisher: Intelligent Parameters Ltd · Identifier: https://healtheconomics.wiki/formula/average-cost-with-its-average-fixed-and-average-variable-parts